{"id":"FOR-032","kind":"context","level":"foreign","jurisdiction":"Malaysia","state":"","metro":"","industry":"","agency":"","eco":"","issuer":"Prime Minister\u0027s Office and National Security Council; Ministry of International Trade and Industry (manufacturing approvals)","authority":"Prevention and Control of Infectious Diseases Act 1988 (Act 342); Emergency (Essential Powers) Ordinance 2021","instrument":"MCO 2.0 (Jan. 13, 2021, selected states); nationwide MCO 3.0 from May 12, 2021; nationwide \u0027total lockdown\u0027 (Phase 1 of the National Recovery Plan) from June 1, 2021, with essential manufacturing limited to a 60 percent workforce and other sectors closed; NRP phases through the third quarter of 2021","title":"MCO 2.0, MCO 3.0 and the June 1, 2021 total lockdown","dateIssued":"2021-05-28","effective":"2021-06-01","end":"Phased under the National Recovery Plan (Phase 2 from July 2021 in some states; Phase 3-4 for others from September-October 2021); the 60 percent essential-manufacturing workforce cap ran from June 1 to Aug. 15, 2021, replaced by vaccination-rate-based capacity from Aug. 16, 2021","startDate":"2021-06-01","endDate":"2021-08-15","quarters":["2021Q1","2021Q2","2021Q3"],"types":["STAY","CLOSE","CAP","SUPPLY"],"addressees":["all persons and businesses in Malaysia","manufacturers (MITI approval and workforce caps)"],"clause":"Not read.","enforcement":"Act 342; Emergency Ordinance","functions":["SC semiconductor packaging and test; electronic components; gloves","PF U.S. automotive and electronics plants dependent on Malaysian back-end capacity"],"notes":"The June-August 2021 Malaysian closures and workforce caps are the proximate foreign event in the third-quarter 2021 semiconductor shortage that the Department of Commerce called \u0027ongoing\u0027 on Sept. 24, 2021 (Ex. ECO-A-077); plead through the United States\u0027 own records (Exs. ECO-A-077, ECO-A-107).","sourceUrl":"","snapshot":"","fileExists":false,"fileBytes":0,"grade":"secondary","character":"","description":"","collection":"FOR","url":"/library/FOR-032","exhibitUrl":null,"citation":"Prime Minister\u0027s Office and National Security Council; Ministry of International Trade and Industry (manufacturing approvals), MCO 2.0 (Jan. 13, 2021, selected states); nationwide MCO 3.0 from May 12, 2021; nationwide \u0027total lockdown\u0027 (Phase 1 of the National Recovery Plan) from June 1, 2021, with essential manufacturing limited to a 60 percent workforce and other sectors closed; NRP phases through the third quarter of 2021 (May 28, 2021) (Ex. FOR-032)","stateName":"","related":["ECO-A-077","ECO-A-107"]}