- Proclamation 20-25 as amended (Apr. 24, 2020); RCW 49.17.060
- Issued
- 2020-04-24 Apr. 24, 2020
- Effective
- 2020-04-24
- End
- Superseded by Phase 2 construction requirements (May 2020) and Safe Start construction guidance; construction-specific requirements ended June 30, 2021 (read as 2021-06-30)
- In force
- Apr. 24, 2020 to June 30, 2021
- Quarters
- 2020 Q22020 Q32020 Q42021 Q12021 Q2
2020 Q22020 Q32020 Q42021 Q12021 Q22021 Q3
- Limitation types
- Business closureWorkplace rules
- Addressees
- all contractors on existing construction projects
- Functions reached
- JS
- SB
- HR (screening, training)
- OP (plan, posting)
- Collection
- Construction SEC-09
Operative words
Any existing construction projects complying with the points below may resume only those work activities that do not require workers to be closer than six-feet together. If a work activity requires workers to be closer than six-feet, it is not considered low-risk and is not authorized... Prior to recommencing work all contractors are required to develop and post at each job site a comprehensive COVID-19 exposure control, mitigation, and recovery plan... Failure to meet posting requirements will result in sanctions, including the job being shut down.
Enforcement
Job shutdown; RCW 49.17.060 duties enforced by L&I
Notes
New projects not permitted in Phase 1; only 'existing' projects.